First determine what the wall supports
An internal wall may support roof or floor loads, or provide bracing. A structural engineer may need to design beams, posts and supports, with appropriate building permits where required. Do not treat a wall as non-structural without assessment.
Look beyond the new kitchen
A new island or dining area changes circulation, lighting and furniture placement. Consider clearances, storage, sightlines, ventilation and access to outdoor spaces before locking in the cabinetry design.

Allow for floors and ceilings
Removed walls often expose mismatched flooring, ceilings, bulkheads or different floor levels. Matching existing finishes may not be possible. These adjoining works should be included in the scope, not left as an unexpected variation.
Check plumbing and electrical services
Moving a sink or cooktop, adding power points or changing heating and cooling can affect services outside the visible renovation area. Coordinating the kitchen, laundry and bathrooms can make the work more efficient.
Set the right preconstruction sequence
An initial discussion identifies goals and budget. Detailed site information, design, engineering and selections are then developed through preconstruction before the final scope and construction price are agreed.