Design + Build Renovations

Design & Build Home Renovations Melbourne

Major renovations planned around the way you live. Brownlow Building brings design, selections, preconstruction and construction together so your project is considered properly before building begins.

Registered Victorian Builder — CDB-U 10087040+ years combined construction experienceMelbourne basedStructured planning & project management

Planning a Home Renovation? Let’s Talk About Your Ideas.

Whether you’re planning a complete home renovation, updating your living spaces or transforming your kitchen, bathroom or laundry, Brownlow Building can help you understand what’s possible. Our Home Renovation Design Consultant will discuss your ideas, priorities and budget, and explain how our structured design-and-build process can take your project from concept through to construction.

Discuss Your Renovation Project

Initial project discussion only. Detailed design and preconstruction services follow Brownlow Building’s established process.

Design Before We Build

Design Decisions Developed Alongside the Construction Team

Brownlow brings design development and construction planning into the same process. The design stage is where the renovation takes shape — and it's where the practical, buildable and budget realities of the project are worked through.

Design decisions are developed alongside the construction team, helping keep the design practical, buildable and aligned with the client's project budget.

Brownlow provides in-house design development, material selections and finish guidance. Where a project requires architectural documentation, we coordinate with external architects and building designers engaged for your project.

Understanding How You Want to Use the Home

We start by understanding your goals, how you live, and what the renovated home needs to do for your family.

Space Planning & Layout Development

Proposed layouts are developed to improve flow, function and the relationship between rooms.

Concept Design

Concept design develops the renovation direction so decisions can be made before detailed documentation.

Cabinetry & Joinery Planning

Kitchen, bathroom, laundry and built-in joinery are planned around storage, function and the spaces available.

Fixtures & Material Selections

Fixtures, fittings and materials are selected to suit the design, your preferences and the project budget.

Finishes & Colour Coordination

Finishes, colours and textures are coordinated so the completed renovation feels considered and cohesive.

Buildability Input from the Construction Team

The construction team reviews the design as it develops, flagging practical and buildability considerations early.

Early Budget Alignment

Indicative budget conversations happen during the design stage, before documentation becomes too advanced.

Where required, Brownlow coordinates drafting, engineering, surveyors and other consultants — so the design and documentation are developed together with one team managing the process.

The Brownlow Renovation Process

A Structured Process from First Conversation to Handover

Major renovations are a significant investment. Brownlow follows a structured process so design, selections, documentation and construction are each given the attention they need.

1

Initial Enquiry & Discovery

We discuss your renovation goals, the areas you want to change, your timeframe and your initial budget expectations.

2

Site Consultation

We meet you on site to inspect the existing home, discuss scope and understand the conditions that will influence the renovation.

3

Preliminary Estimate

Based on the site consultation and your renovation direction, we provide a preliminary estimate to help align scope and budget before committing to detailed design.

4

Preliminary Agreement

A Preliminary Agreement of $1,500 + GST plus applicable disbursements formalises the next stage. This fee is credited toward the 5% deposit under Brownlow’s standard arrangement when the project proceeds.

5

Design & Selections

Design development, layout planning, cabinetry and joinery, fixture and material selections and finishes are worked through with the construction team.

6

Drafting, Engineering & Consultants

Required drafting, engineering, surveyor and other consultant input is coordinated by Brownlow as the design develops.

7

Detailed Final Quotation

Once the scope, selections and documentation are sufficiently defined, Brownlow provides a detailed fixed-price final quotation.

8

Building Contract & Home Warranty

A building contract is prepared and applicable Home Warranty requirements are addressed for eligible domestic building work.

9

Construction & Project Management

Our team manages construction from commencement through to completion with clear communication throughout.

10

Completion & Handover

Final walkthrough, completion and handover of the renovated home.

About the Preliminary Agreement. The $1,500 + GST fee formalises the preliminary design and preconstruction stage. Applicable third-party disbursements — such as engineering, surveyor or drafting fees — are additional and are quoted as required. The fee is credited toward the 5% deposit under Brownlow\u2019s standard arrangement when the project proceeds to contract. Design and consultant costs beyond the preliminary stage are scoped and quoted separately as the project develops.

Renovating Several Areas at Once

Plan Your Kitchen, Bathroom, Laundry and Living Areas as One Project

If you're planning to renovate a kitchen, bathroom, laundry and living areas over time, it's worth considering whether planning the work as one coordinated project makes sense for your home. Coordinating multiple areas under one renovation can deliver practical benefits that separate renovations can't.

Consistent Design

Finishes, colours, joinery and fixtures are selected together so the renovated spaces feel cohesive rather than piecemeal.

Coordinated Trades

Plumbers, electricians, carpenters, tilers and painters are scheduled as one team across all areas.

Shared Construction Planning

One construction program covers every area, so the build is sequenced sensibly from start to finish.

Fewer Duplicated Setup Costs

Site setup, skip bins, protection and mobilisation are shared across the project rather than repeated for each separate renovation.

Better Sequencing

Walls, floors, services and finishes are completed in the right order across all rooms.

Less Overall Disruption

Completing several rooms in one coordinated project is generally less disruptive than living through multiple separate renovations over time.

One Team, One Program

When Brownlow manages several renovation areas together, you deal with one team, one contract structure and one construction program — rather than coordinating multiple separate builders, trades and timelines.

Why Design + Build

Design and Construction Working Together

When design decisions and construction planning happen together, the renovation is developed with a practical understanding of what it takes to actually build it. That doesn't eliminate every challenge of a major renovation — but it does help the project stay aligned as it progresses.

Early Buildability Input

The construction team reviews the design as it develops, flagging practical and structural considerations before they become expensive to change.

Budget Conversations Early

Indicative budget discussions happen during design, before documentation becomes too advanced to adjust without significant cost.

Fewer Handover Gaps

Design and construction sit within the same team, reducing the gaps that can occur when a designer hands a complete package to an unrelated builder.

Clearer Selections

Fixtures, finishes and materials are selected with construction input, so what is designed is what can be built within the budget.

Coordinated Consultants

Drafting, engineering, surveyor and other consultant input is coordinated through Brownlow as part of the one process.

One Team Accountable

One team is responsible for progressing the project from design through to construction and handover.

Renovation Planning Considerations

What Needs to Be Considered When Planning a Major Renovation

Major renovations in Melbourne involve more than finishes. These are some of the planning considerations that commonly affect scope, cost and program. This is general information to help you think through your project — not legal advice.

Existing Structural Conditions

The condition of the existing structure influences what can be retained, altered or extended, and what needs repair before new work starts.

Load-Bearing Walls

Removing or altering walls often requires structural steel, beams and engineering — particularly in open-plan conversions.

Plumbing & Drainage

Moving kitchens, bathrooms and laundries can require drainage alterations, new plumbing runs and connection to existing services.

Electrical Upgrades

Major renovations often require switchboard upgrades, new circuits and rewiring to meet current standards and the new layout.

Waterproofing

Wet areas must be waterproofed in accordance with the relevant Australian Standard to avoid long-term moisture problems.

Floor Levels

Variations in floor levels between old and new, or between rooms, need to be considered in the layout and finishes.

Asbestos in Older Homes

Many Melbourne homes built before 1990 contain asbestos. Identification and safe removal are managed as part of the renovation.

Building Permits

Most structural, plumbing and electrical renovation work requires a building permit. Brownlow manages permits and approvals.

Planning Permits

Some properties — heritage overlays, certain extensions or change of use — may also require a planning permit from council.

Energy Requirements

New work and glazing must meet current energy efficiency requirements under the National Construction Code.

Existing Defects or Moisture Damage

Hidden defects, rot or moisture damage are often uncovered during renovation and need to be addressed as part of the scope.

Project Examples

Recent Brownlow Renovation Work

A selection of renovation work completed by Brownlow Building across Melbourne. These images are shown to illustrate the type of major renovation work we deliver. Speak with us about how a similar approach could apply to your home.

Major home renovation in Melbourne featuring a modern open-plan kitchen, dining and living area designed and built by Brownlow Building.

Open-Plan Whole Home Renovation

Modern open-plan living renovation in Melbourne featuring a spacious kitchen, dining and living area with seamless indoor-outdoor entertaining by Brownlow Building.

Kitchen & Living Transformation

Contemporary bathroom renovation in Melbourne with jade green herringbone feature tiles, floating timber vanity, stone benchtop, brushed brass fittings and frameless glass shower by Brownlow Building.

Bathroom Renovation

Heritage home renovation in Melbourne featuring a Victorian façade with decorative period detailing and sympathetic modern restoration by Brownlow Building.

Heritage & Character Renovation

Major structural home renovation in Melbourne featuring exposed structural steel beams, temporary propping, wall removal and engineered building alterations by Brownlow Building.

Structural Alterations

Rear home extension in Melbourne featuring a modern open-plan kitchen, dining and living area with expansive sliding glass doors and seamless integration with the original home by Brownlow Building.

Renovation Combined with Extension

Start Your Renovation Conversation

Tell Us About Your Renovation

Share a few details about your project and one of our team will call you within 1 business day to discuss scope, budget and next steps.

By submitting, you agree to be contacted by Brownlow Building regarding your enquiry.

FAQ

Major Home Renovation FAQs

Answers to common questions about major home renovations, design and build, and the Brownlow process.

Melbourne renovation expertise

Planning a Renovation in Your Area?

Every home has different conditions, access and design requirements. These guides explain some of the considerations for established homes across the Peninsula, Bayside and South-East, before the design and construction scope is developed.

  • Registered Victorian Builder — CDB-U 100870
  • Home Warranty for eligible domestic building work
  • 40+ Years Combined Construction Experience
  • Melbourne Based

Clear advice. Experienced people. A structured approach from the first conversation through to completion.

Start Your Renovation

Plan Your Major Renovation With Melbourne's Registered Builders

Brownlow Building brings design, selections, preconstruction and construction together so your renovation is considered properly before building begins.